用户名: 密码:  用户登录   新用户注册  忘记密码  账号激活
您的位置:教学资源网 >> 试卷 >> 英语试卷
高中英语编辑
西藏日喀则市南木林中学2018-2019学年高一下学期期末考试试题(英语)
下载扣金币方式下载扣金币方式
需消耗2金币 立即下载
1个贡献点 立即下载
1个黄金点 立即下载
VIP下载通道>>>
提示:本自然月内重复下载不再扣除金币
  • 资源类别试卷
    资源子类期中期末
  • 教材版本不限
    所属学科高中英语
  • 适用年级高一年级
    适用地区全国通用
  • 文件大小1891 K
    上传用户123wangyan
  • 更新时间2019/9/16 8:47:44
    下载统计今日0 总计10
  • 评论(0)发表评论  报错(0)我要报错  收藏
0
0
资源简介
A
March 1, 2019
Dear Residents
RE. NOTICE OF CONSTRUCTION-SHORELINE EROSION PROTECTION
Sheet Pile Wall, Rip Rap Protection 抛石护岸and Spot Repair on SA SU Road between Church and Jimmy Road> Tsawout First Nation. Our File: CPMS 6849
Beginning April 1, 2019, our community, Tsawout First Nation, will be beginning work on the Shoreline Erosion (侵蚀)Protection project along SA SU Road between Church and Jimmy Road. Workers employed by Donn Mann Excavating and Tsawout First Nation Public Works Department will be onsite working from 7: 00 am until 5: 00 pm daily Monday to Friday until September 30, 2019.
PROJECT RELATED INFORMATION AND RECOMMENDATIONS
Traffic Delays -In order to safely and efficiently complete this construction item, there will be some lane 车道 restrictions. Car drivers must follow the polices orders, slow down the speed, and pass the construction area extremely cautiously. The construction item may cause traffic delays. We will make every effort to minimize any potential inconvenience and provide you with the latest notice when disruptions 中断must occur. Police and emergency vehicle access will be maintained at all times.
Truck Traffic -At times you will notice increased truck traffic in the construction area. Please be aware and use extra caution while driving
Vibration -You may experience some vibration at home during the construction. The shaky motion happens due to the work being done. We recommend that you remove or secure objects on shelves and walls.
This construction item is part of the Tsawout First Nation Shoreline Erosion Protection
project that will be beginning in
April 2019 and is expected to be completed by the end of 2019. Please see upcoming
newsletters and notices for further updates.
Thank you for your patience and cooperation
Sincerely
Rob Mortin
Tsawout First Nation
1.How long will the construction item last?
A.bout 4 months.   B. About 5 months.   C. About 6 months. D. About 7 months.
2.What do you know about traffic regulations during the construction?
A.Car drivers shall pass through the construction area with great care
B .Only emergency vehicles can pass through the construction area
C.No vehicle will be allowed to pass through the construction area
D.All vehicles shall be checked before entering the construction area.
3.It is recommended that nearby residents should
A.avoid driving their vehicles in the rush-hours B.make sure that their walls are in good condition
C.update upcoming newsletters and notices daily D.have their photo frames taken down from the walls
  • 暂时没有相关评论
精品专题

请先登录网站关闭

  忘记密码  新用户注册