用户名: 密码:  用户登录   新用户注册  忘记密码  账号激活
您的位置:教学资源网 >> 试题 >> 英语试题
高中英语编辑
2020年高三一轮复习第十三套6Units1-2单元训练B卷(英语 解析版)
下载扣金币方式下载扣金币方式
需消耗0金币 立即下载
0个贡献点 立即下载
0个黄金点 立即下载
VIP下载通道>>>
提示:本自然月内重复下载不再扣除金币
  • 资源类别试题
    资源子类一轮复习
  • 教材版本不限
    所属学科高中英语
  • 适用年级高三年级
    适用地区全国通用
  • 文件大小961 K
    上传用户123wangyan
  • 更新时间2019/9/15 10:35:51
    下载统计今日0 总计8
  • 评论(0)发表评论  报错(0)我要报错  收藏
0
0
资源简介
A
Famous Modern Chinese Buildings
Beijing International Airport
The first place most visitors see when they arrive in China is Beijing International Airport. The airport was constructed in the 1950s. It has an indoor garden, a children's playground, and over 70 food businesses in Terminal 3 alone.
Shanghai World Financial Center
Completed in 2008, SWFC took over 10 years to complete due to financial shortages and construction delays. Since its completion, it has won countless architectural awards.
Tourists are welcome at SWFC's viewing platform, which at 474 meters above ground is the world's highest closed viewing platform.
The Water Cube
It was constructed for use during the 2008 Summer Olympics. Now visitors can express surprise at the architecture of the building. They can destroy the indoor atmosphere as well.
Among the offerings of the Water Cube are a restaurant and bar, a shopping area, and Water World, a family water park.
The Bird's Nest, Beijing
It was designed mainly for the 2008 Summer Olympics. It can hold up to 80,000 people and has been used for a winter theme park. Nowadays, its main income is as a tourist attraction. It draws more than 20,000 tourists every day.
National Center for the Performing Arts
It was completed in 2007. The building is surrounded by a man­made lake, requiring guests to enter via an underground hallway. It is home to an Opera Hall, Music Hall, and Theater.
21.Which of the following buildings was first constructed?
A.Beijing International Airport.
B.Shanghai World Financial Center.
C.The Water Cube.
D.The Bird's Nest, Beijing.
22.Why was the construction of Shanghai World Financial Center delayed?
A.It needed more construction workers.
B.It was short of adequate money.
C.It added an extra viewing platform.
D.It faced too much terrible weather.
23.How does the Bird's Nest operate daily?
A.By renting the winter theme park.
B.By increasing its opening time.
C.By charging tourists for admission fees.
D.By giving some live concerts.
24.What can you do in National Center for the Performing Arts?
A.Enjoy sports events.
B.Play musical instruments.
C.Attend science lectures.
D.Watch different performances.
  • 暂时没有相关评论

请先登录网站关闭

  忘记密码  新用户注册